About BAOFENG STEEL GROUP
Manufacturing capability, quality systems and project experience behind every BAOFENG supply.
A Manufacturing-Based Pipe & Tube Group
Founded in 2000, BAOFENG STEEL GROUP CO., LTD. is a China-based manufacturer of stainless steel and high-performance nickel alloy tubular products, with a manufacturing footprint of approximately 300,000 square meters and more than 900 employees.
Our manufacturing routes cover seamless pipe & tube, welded pipe, heat exchanger tube, seamless coiled tubing, precision and instrumentation tubing, duplex and super duplex stainless steels, and nickel alloys for demanding industrial service.
BAOFENG supports EPC contractors, end users, engineering companies, equipment manufacturers and distribution partners with project-based manufacturing, inspection coordination, documentation, traceability and delivery support across oil & gas, petrochemical, LNG, power, marine & offshore, chemical processing and other critical industries.
Seamless Coiled Tubing Manufacturing Base
A dedicated production base focused on ultra-long seamless stainless steel and special alloy coiled tubing, supporting continuous-length tubing requirements for oil & gas, LNG, instrumentation, heat transfer and other demanding applications.
Manufacturing at a Glance
Four Manufacturing Routes for Project Supply
Different products require different manufacturing routes. BAOFENG combines multiple pipe and tube production systems so project requirements can be matched to the appropriate process, material and inspection route.

Seamless Pipe & Tube
Route 01For high-pressure, corrosion-resistant and critical-service pipe and tube requirements.

Welded Pipe
Route 02For project piping requirements involving larger diameters, process service and engineered fabrication routes.

Heat Exchanger Tube
Route 03Precision tube production for heat transfer equipment, including straight tube and formed tube requirements.

Seamless Coiled Tubing
Route 04Ultra-long continuous tubing for chemical injection, control lines, instrumentation, heat transfer and specialized fluid service.
Inspection Built Into the Manufacturing Process
Quality control is not limited to final inspection. Verification, testing and traceability are integrated from incoming material through production and final release according to product and project requirements.
30-Second Factory Walkthrough
Raw Material → Manufacturing → Inspection → Packing → Shipment
Material & Traceability Control
- • Raw material verification
- • Heat number identification
- • Material certificate review
- • Traceability through production and final marking
Non-Destructive Testing
- • Eddy Current Testing (ET)
- • Ultrasonic Testing (UT)
- • X-ray / radiographic inspection where applicable
- • Penetrant testing where applicable
Pressure & Integrity Testing
- • Hydrostatic testing
- • Air-tightness testing
- • High-pressure testing for applicable project requirements
- • Project-specific pressure holding requirements
Mechanical & Corrosion Testing
- • Tensile testing
- • Flattening test
- • Flaring test
- • Intergranular corrosion testing where required
Dimensional & Surface Inspection
- • OD / wall thickness verification
- • Visual inspection
- • Surface roughness control where specified
- • Borescope inspection where required
Documentation & Final Release
- • EN 10204 3.1 material certificates
- • EN 10204 3.2 documentation where project-required
- • Inspection and test reports
- • Project documentation package and shipment records
Qualification, Inspection & Export Support
Project supply requires more than manufacturing. BAOFENG supports supplier qualification, inspection coordination, traceability, packing and documentation through the delivery process.
Certifications & Qualifications
Supporting supplier qualification and project compliance review with documented management, product and industry approvals.
Third-Party Inspection Support
Customer-appointed or project-required third-party inspection can be coordinated at agreed manufacturing and inspection stages.
- ✓ Inspection and Test Plan coordination
- ✓ Witness / hold point support where required
- ✓ Document review and inspection records
- ✓ Customer or appointed inspector access by arrangement
Export Packing & Documentation
Packing, marking and documentation are prepared around product form, shipping method and project requirements.
- • Export seaworthy packing
- • Wooden cases / steel frames / coil protection
- • Heat number and project marking
- • MTC, inspection reports and packing documents
- • Shipping documentation package
Manufacturing Capability Proven in Projects
Selected references show the scale, continuity and technical requirements BAOFENG has supported in real industrial applications.
Major LNG Project Supply
TP304L seamless coiled tubing supplied for major LNG project requirements.
View Projects → 450 TONSLarge Coil-Wound Heat Exchanger
S30409 tubing supplied for a technically demanding large-scale heat exchanger project.
View Projects → 182,500 MOilfield Chemical Injection
TP316L seamless coiled tubing supplied for a chemical injection line application.
View Projects →See How BAOFENG Manufactures
Visit our manufacturing facilities or arrange a live video tour to review production routes, inspection capability and project documentation with our team.